Notice: Function WP_Scripts::localize was called incorrectly. The
$l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/cqp7rb5ffnba/public_html/test.se-texas.com/wp-includes/functions.php on line 6085Notice: Function WP_Scripts::localize was called incorrectly. The
$l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/cqp7rb5ffnba/public_html/test.se-texas.com/wp-includes/functions.php on line 6085Notice: Function WP_Scripts::localize was called incorrectly. The
$l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/cqp7rb5ffnba/public_html/test.se-texas.com/wp-includes/functions.php on line 6085Notice: Function WP_Scripts::localize was called incorrectly. The
$l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/cqp7rb5ffnba/public_html/test.se-texas.com/wp-includes/functions.php on line 6085Notice: Function WP_Scripts::localize was called incorrectly. The
$l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/cqp7rb5ffnba/public_html/test.se-texas.com/wp-includes/functions.php on line 6085Notice: Function WP_Scripts::localize was called incorrectly. The
$l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/cqp7rb5ffnba/public_html/test.se-texas.com/wp-includes/functions.php on line 6085Notice: Function WP_Scripts::localize was called incorrectly. The
$l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/cqp7rb5ffnba/public_html/test.se-texas.com/wp-includes/functions.php on line 6085
Schneider Engineering understands that residential and commercial development is a long-term investment, and that every project must meet a wide array of objectives in order to be successful. From feasibility studies to construction drawings, we have a vast amount of experience assisting developers with creating well-designed and well-built projects.
Sample projects are shown below. To request more information, visit our Contact Us page or call us at 830.249.3887.
This subdivision is a master-planned, artisan-inspired community located in Central Texas. Once completed, this subdivision will total 1,240 acres with 2,480 homes overall. Schneider Engineering is performing electrical and gas design, with the scope of work including: Engineering analysis of underground electrical distribution system; Preparation of construction drawings for underground electrical and gas systems; Providing construction specifications and general material take-offs for the installation of electric and gas URD primaries; Providing description of major material items to be installed; Providing layout drawings to bidding entities and utility; Performing interim inspections during construction; Preparing Final “As-Built” drawings; Providing material and labor bidding document with description quantities; Answering RFIs as requested; SE also designed a new substation being fed by two 138kV transmission line feeds. The scope of this project was to add a new 46.7 MVA power transformer bank including new distribution breakers, total breaker, tied breaker, and related structures. SE performed engineering design, plans and drawings, construction bidding and contracting, as well as construction coordination and inspection.
